EXXONMOBIL PIPELINE COMPANY LLC
hazardous_liquid Incident — — February 5, 2025
Incident Information
| Incident Date | February 5, 2025 |
| Operator | EXXONMOBIL PIPELINE COMPANY LLC |
| Commodity | CRUDE OIL |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 29.52092, -95.10630 |
Cause
| Cause | MATERIAL FAILURE OF PIPE OR WELD |
| Subcause | "DESIGN-, CONSTRUCTION-, INSTALLATION-, OR FABRICATION-RELATED" |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $20,000 |
| Emergency Response | $20,000 |
| Other Costs | $0 |
Location Map
Incident Narrative
"INCIDENT SUMMARY: AT 14:00 ON 02/05/25 AN EMPCO EMPLOYEE NOTICED CRUDE OIL ON THE GROUND AROUND TANK HEADER PIPING. IMMEDIATE CORRECTIVE ACTION WAS TAKEN TO ISOLATE SYSTEM AND CLEAN-UP CREWS BEGAN REMOVING CONTAMINATED SOIL. AT 15:00 THE SOURCE OF THE LEAK WAS IDENTIFIED, AND THAT PORTION OF THE SYSTEM REMAINED LOCKED OUT UNTIL REPAIRS COULD BE MADE. ALL CONTAMINATED SOIL WAS REMOVED BY 18:00. INVESTIGATION ROOT CAUSE: ~300FT OF UNDERGROUND SUMP DISCHARGE LINE WAS FOUND TO BE HDPE (HIGH DENSITY POLYETHYLENE). THE LEAK OCCURRED DUE TO A CRACK ~0.25"" IN LENGTH AT THE WELD JOINT BETWEEN TWO SECTIONS OF HPDE. PREVENTING RE-OCCURRENCE: ADDITIONAL PROJECT EXECUTED AND EXISTING HDPE PIPE WAS HYDRO EXCAVATED AND REPLACED. A NEW 2"" FBE COATED SCH80 X42 CARBON STEEL SUMP DISCHARGE LINE WAS FABRICATED, WELDS INSPECTED, HYDROTESTED, AND FIELD JOINTS WERE RE-COATED BEFORE BEING PUT BACK INTO SERVICE."