"WESTERN MIDSTREAM PARTNERS, LP"

hazardous_liquid Incident — — March 13, 2025

Incident Information

Incident DateMarch 13, 2025
Operator"WESTERN MIDSTREAM PARTNERS, LP"
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates31.53921, -103.35752

Cause

CauseEQUIPMENT FAILURE
SubcauseTHREADED CONNECTION/COUPLING FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$250
Emergency Response$0
Other Costs$0

Location Map

Incident Narrative

"THE PIGGING CREW TOOK A PROACTIVE APPROACH BY REVIEWING THE PIGGING BARRELS SCHEDULED FOR THE NEXT DAY'S ACTIVITY. UPON ARRIVING AT THE MONROE 10"" SOUTH PIGGING BARREL, THEY DISCOVERED EVIDENCE OF A LEAK, INDICATED BY DARK SOIL STAINS. FURTHER INSPECTION REVEALED THAT THE LEAK ORIGINATED FROM THE BUSHING-TO-PRESSURE WARNING LOCK CONNECTION. UPON INSPECTION, IT APPEARED THAT THE PRESSURE WARNING LOCK SHOWED SIGNS OF GALLING, LIKELY CAUSED BY FRICTION BETWEEN THE PRESSURE WARNING LOCK SHAFT AND CLAMP RING LOCKING LUG. THE CREW PROMPTLY ISOLATED THE BARREL BY RETURNING IT TO NORMAL OPERATIONS, DRAINED IT, REPLACED THE BUSHING AND PRESSURE WARNING LOCK, AND REALIGNED THE VALVES TO ""RECEIVE MODE."" FOLLOWING THE REPLACEMENT, NO LEAKS WERE DETECTED. THIS INCIDENT OCCURRED ON A WESTERN MIDSTREAM SUBSIDIARY PIPELINE, DBM OIL SERVICES, LLC"