SOUTH BOW INFRASTRUCTURE OPERATIONS INC.

hazardous_liquid Incident — — April 8, 2025

Incident Information

Incident DateApril 8, 2025
OperatorSOUTH BOW INFRASTRUCTURE OPERATIONS INC.
CommodityCRUDE OIL
Pipeline Typehazardous_liquid

Location

State
Coordinates46.58659, -97.93312

Cause

CauseMATERIAL FAILURE OF PIPE OR WELD
SubcauseORIGINAL MANUFACTURING-RELATED (NOT GIRTH WELD OR OTHER WELDS FORMED IN THE FIELD)

Casualties

Fatalities0
Injuries0

Costs

Property Damage$3,938,821
Emergency Response$14,796,861
Other Costs$0

Location Map

Incident Narrative

"APRIL 8, AT APPROXIMATELY 07:42 AM CENTRAL TIME, THE CONTROL CENTER RECEIVED A LEAK DETECTION ALARM INDICATING A RELEASE AND IMMEDIATELY BEGAN THE ISOLATION PROCESS. AS WELL, LOCAL TECHNICIANS WERE NEAR THE RELEASE LOCATION STARTING MAINTENANCE WORK AND CONFIRMED LOSS OF CONTAINMENT. THE LOCAL TECHNICIANS ALSO ACTIVATED AN EMERGENCY SHUTDOWN AND NOTIFIED THE CONTROL CENTER. ADDITIONAL NOTIFICATIONS WERE IMMEDIATELY MADE TO COMPANY, LOCAL, AND FEDERAL EMERGENCY RESPONDERS. OCTOBER 15, THE RELEASE WAS DUE TO A SUDDEN RUPTURE EVENT, AND THE AXIS OF THE RUPTURE ALIGNS WITH THE PIPE

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in