CAPTUREPOINT LLC

hazardous_liquid Incident — — May 21, 2025

Incident Information

Incident DateMay 21, 2025
OperatorCAPTUREPOINT LLC
CommodityCO2 (CARBON DIOXIDE)
Pipeline Typehazardous_liquid

Location

State
Coordinates36.82845, -100.66192

Cause

CauseCORROSION FAILURE
SubcauseEXTERNAL CORROSION

Casualties

Fatalities0
Injuries0

Costs

Property Damage$18,500
Emergency Response$1,500
Other Costs$1,000

Location Map

Incident Narrative

"ON MAY 21, 2025, EAGLE SKY PATROL NOTIFIED AUSTEN PITTS THAT THERE WAS AN ANOMALY ON OUR PIPELINE ROW. HE PROCEEDED TO THE LOCATION INDICATED BY THE SKY PATROL TO CONFIRM THE LINE FAILURE. THE AREA SUPERVISOR, JOSH BURKHART, WAS CONTACTED. AN OPERATIONAL PLAN WAS DISCUSSED TO SHUT-IN MLV6 AND MLV7 TO CONTAIN AND BLOWDOWN THE PIPELINE. SHORTLY AFTER, MLV5 AND MLV8 WOULD BE SHUT-IN TO COMPLETE ISOLATION OF THE AREA. THE STATE BIOLOGIST WAS NOTIFIED THAT AUSTEN WOULD BE ENTERING THE BEAVER RIVER WILDLIFE MANAGEMENT AREA (WMA) TO INVESTIGATE THE PIPELINE FAILURE. ONCE THE PIPELINE FAILURE WAS CONFIRMED, AUSTEN CONTACTED THE BEAVER COUNTY, OKLAHOMA SHERIFF

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in