PHILLIPS 66 PIPELINE LLC
hazardous_liquid Incident — — October 4, 2025
Incident Information
| Incident Date | October 4, 2025 |
| Operator | PHILLIPS 66 PIPELINE LLC |
| Commodity | HVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 30.10963, -90.53254 |
Cause
| Cause | EXCAVATION DAMAGE |
| Subcause | EXCAVATION DAMAGE BY OPERATOR'S CONTRACTOR (SECOND PARTY) |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $1,800,000 |
| Emergency Response | $20,000 |
| Other Costs | $0 |
Location Map
Incident Narrative
"DURING SITE PREPARATION FOR THE REMOVAL OF AN IN-LINE INSPECTION TOOL, RV-28 WAS STRUCK BY SHEET PILING DUE TO IMPROPER LINE MARKING BY A CONTRACTOR. AT THE TIME OF THE INCIDENT, IT WAS UNKNOWN WHICH LINE HAD BEEN STRUCK DUE TO THE NUMBER OF OPERATOR AND THIRD-PARTY LINES IN THE CROSSING. LINES IN THE IMMEDIATE VICINITY OF THE RELEASE WERE SHUT DOWN TO VERIFY INTEGRITY. ON MONDAY, 10/6, DIVERS WERE ABLE TO LOCATE THE DAMAGED PIPING AND CONFIRM OWNERSHIP. AT THIS TIME, ALL NOTIFICATIONS WERE MADE TO CORRESPONDING AGENCIES AND OPERATORS. 1/12/26 UPDATE: APPROXIMATELY 300 FEET OF THE DAMAGED SECTION OF LINE WAS CUT OUT AND REPLACED. THE LINE RETURNED TO SERVICE ON NOVEMBER 9TH, AFTER ALL REPAIRS WERE MADE. UPDATES TO FINAL COSTS, CORRECTIVE ACTION PIPELINE STARTUP, ETC."