"DENBURY ONSHORE, LLC"
hazardous_liquid Incident — — October 16, 2025
Incident Information
| Incident Date | October 16, 2025 |
| Operator | "DENBURY ONSHORE, LLC" |
| Commodity | CO2 (CARBON DIOXIDE) |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 31.28538, -90.50947 |
Cause
| Cause | EQUIPMENT FAILURE |
| Subcause | OTHER EQUIPMENT FAILURE |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $257,000 |
| Emergency Response | $190,000 |
| Other Costs | $0 |
Location Map
Incident Narrative
"A RELEASE OF CARBON DIOXIDE OCCURRED AT THE NEJD MLV-040 SITE ON OCTOBER 16, 2025. THE EVENT WAS FIRST IDENTIFIED WHEN TECHNICIANS PERFORMING MAINTENANCE ON THE MAINLINE VALVE AT MLV-040 OBSERVED CO2 LEAKING FROM THE VALVE STEM AREA AT APPROXIMATELY 6:50 PM CT. UPON NOTIFICATION TO THE CONTROL ROOM, UPSTREAM AND DOWNSTREAM REMOTE-OPERATED VALVES WERE CLOSED. ADDITIONAL BLOCK VALVES WERE MANUALLY CLOSED TO FURTHER ISOLATE THE SEGMENT. AIR MONITORING WAS INITIATED IN COORDINATION WITH LOCAL EMERGENCY RESPONDERS, AND NOTIFICATIONS WERE MADE TO THE APPROPRIATE AGENCIES. NO INJURIES, FIRES, OR EVACUATIONS OCCURRED, AND THERE WERE NO REPORTED IMPACTS ON NEARBY RESIDENTS. OPERATIONS PERSONNEL, IN COORDINATION WITH LOCAL EMERGENCY AGENCIES, ELECTED TO POSTPONE NIGHTTIME BLOWDOWN ACTIVITIES ON OCTOBER 16 TO ALLOW THE WORK TO PROCEED UNDER SAFER DAYTIME VISIBILITY AND IMPROVED MONITORING CONDITIONS. CONTROLLED DEPRESSURIZATION OF THE ISOLATED SEGMENT BEGAN THE MORNING OF OCTOBER 17, AND PROGRESSED IN STAGES AS NEEDED BASED ON BLOWDOWN RATES AND SITE CONDITIONS. AIR MOVERS AND CONTINUOUS MONITORING WERE UTILIZED TO SUPPORT PLUME CONTROL, AND ALL ACTIONS WERE CONDUCTED UNDER JOINT OVERSIGHT WITH EMERGENCY RESPONDERS TO ENSURE THE RELEASE WAS SAFELY MITIGATED. THE INVESTIGATION DETERMINED THAT THE STEM SEAL FAILED DUE TO GRADUAL AND TIME-DEPENDENT DEFORMATION OF MATERIAL (CREEP) ALLOWING FOR RELEASE OF CO2 FROM THE BALL VALVE. ADDITIONALLY, THE BALL SEATS WERE FOUND TO HAVE MATERIAL ENTRAINED LIKELY DUE TO WELDING DURING INITIAL CONSTRUCTION OF THE PIPELINE. THIS AFFECTED THE VALVE SEAT