JAYHAWK PIPELINE LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorJAYHAWK PIPELINE LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates38.34023, -98.31132

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

AT 6:40AM A STATION OPERATOR DISCOVERED A LEAKING GAUGE AT CHASE STATION AND ISOLATED THE GAUGE FROM THE OPERATION. THE STATION OPERATOR CALLED THE CONTROL ROOM AND THE AREA FOREMAN, AND AN INCIDENT COMMAND POST WAS ACTIVATED. JPL NOTIFIED KDHE OF THE SPILL. AT 8:50 AM, THE CONTROL ROOM WAS GIVEN RESTART AUTHORITY AND THE PIPELINE WAS RESTARTED AT 8:53 AM. A VAC TRUCK WAS UTILIZED TO CAPTURE THE RELEASED PRODUCT. IMPACTED SOIL WAS MOVED TO A REMEDIATION PLOT. THE GAUGE INVOLVED IN THE RELEASE HAD BEEN TEMPORARILY INSTALLED AS PART OF A MAINTENANCE ACTIVITY TO PREPARE FOR THE CUT OVER TO THE NEW CHASE TO MCPHERSON MAINLINE SEGMENT. THE PLAN WAS TO REMOVE THE GAUGE PRIOR TO RETURNING THE SEGMENT TO SERVICE, HOWEVER, THE UNDERRATED GAUGE WAS INADVERTENTLY LEFT IN PLACE UPON STARTUP. AN INCIDENT INVESTIGATION IS UNDERWAY TO DETERMINE THE CORRECTIVE ACTIONS NECESSARY TO PREVENT RECURRENCE.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in