JEFFERSON RAILPORT TERMINAL I TEXAS LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorJEFFERSON RAILPORT TERMINAL I TEXAS LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates30.08154, -94.08026

Cause

CauseINCORRECT OPERATION
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

WHILE MAKE A PIPELINE TRANSFER INTO TANK 2307 A CONTRACT SOFTWARE PROGRAMMER INADVERTENTLY CLOSED THE MOTOR OPERATED VALVE AT THE INLET TO THE TANK. THE SOFTWARE PROGRAMMER DID NOT KNOW THE CONTROL ROOM OPERATOR WAS MAKING A TRANSFER INTO TANK 2307 AT THE TIME. THE PROGRAMMER DID NOT CHECK WITH THE CONTROL ROOM AND ASSUMED NO TRANSFERS. INVESTIGATION INTO THE CAUSES OF THE INCIDENT FATIGUE WAS NOT DETERMINED TO BE AN ISSUE. THE CONTROL ROOM OPERATOR HAD THE SYSTEM LINED UP ACCORDING TO PROCEDURES. THE THIRD-PARTY PROGRAMMER WAS AT FAULT FOR NOT REPORTING INTO THE CONTROL ROOM OPERATOR PRIOR TO BEGINNING WORK. PROCEDURE HAS BEEN UPDATED FOR ANYONE DOING ANY WORK ASSOCIATED WITH THE CONTROL ROOM IS NOW REQUIRED TO OBTAIN A SAFE WORK PERMIT FROM THE CONTROL ROOM OPERATOR AND SIGN BY THE OPERATION'S SUPERVISOR PRIOR TO BEGINNING WORK. AS NOTED, DRUG AND ALCOHOL TESTING WERE NOT COLLECTED. THE SITE IS NEW TO THE REQUIREMENTS AND DID NOT REALIZE THE REQUIREMENT. SINCE THE INCIDENT JEFFERSON IS ESTABLISHING THE DRUG AND ALCOHOL TESTING INSTRUCTIONS TO SUPERVISION

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in