"ONEOK NGL PIPELINE, LLC"
hazardous_liquid Incident — — November 11, 2025
Incident Information
| Incident Date | November 11, 2025 |
| Operator | "ONEOK NGL PIPELINE, LLC" |
| Commodity | HVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 35.02180, -96.91254 |
Cause
| Cause | EXCAVATION DAMAGE |
| Subcause | EXCAVATION DAMAGE BY THIRD PARTY |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $13,500 |
| Emergency Response | $21,000 |
| Other Costs | $0 |
Location Map
Incident Narrative
"ON NOVEMBER 11TH, 2025, AT 15:15 THE ONEOK NGL PIPELINE CONTROL CENTER WAS CONTACTED BY A LANDOWNER STATING HE HAD STRUCK A PIPELINE IN THE VICINITY OF ONEOK'S 6-INCH TECUMSEH ADA JCT TO TECUMSEH PLANT PIPELINE. ONEOK PERSONNEL WERE DISPATCHED TO THE LOCATION. THE PIPELINE SECTION WAS ISOLATED AND REPAIRED WITH A CLAMP. ON NOVEMBER 17TH, 2025, THE PIPELINE WAS NITROGEN PURGED AND REPAIRS WERE MADE BY PIPE REPLACEMENT."
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.