ENTERPRISE CRUDE PIPELINE LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorENTERPRISE CRUDE PIPELINE LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates30.48158, -97.39943

Cause

CauseINCORRECT OPERATION
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON 11/18/2023 AT 11:38 CST AN ENTERPRISE PIPELINE TECHNICIAN ARRIVED AT COUPLAND PUMP STATION ON THE MIDLAND TO SEALY 2 SYSTEM AND OBSERVED SMOKE AND FIRE COMING FROM UNIT 3100. SIMULTANEOUSLY, SCADA ALARMS FROM THE FACILITY'S FIRE DETECTORS OCCURRED AT THE HOUSTON CONTROL CENTER, SHUTTING DOWN THE STATION. THE PIPELINE TECHNICIAN USED A FIRE EXTINGUISHER TO PUT OUT THE FIRE, WHICH WAS EXTINGUISHED BY 11:44. THE PUMP STATION WAS BYPASSED AND THE LINE REMAINED IN OPERATION. PUMP REPAIRS WERE COMPLETED AND THE PUMP WAS RETURNED TO SERVICE ON 11/29/2023 AT 14:08 CST. THE PUMP SEAL FAILURE APPEARS TO HAVE BEEN CAUSED BY IMPROPER INSTALLATION. IT IS BELIEVED THAT SET SCREWS HAD NOT BEEN SUFFICIENTLY TIGHTENED, AND THE PUMP SEAL SHIFTED AFTER APPROXIMATELY 520 HOURS IN SERVICE. TO PREVENT RECURRENCE, THE APPLICABLE MAINTENANCE PROCEDURE WAS UPDATED TO INSTRUCT PERSONNEL REGARDING PROPER SET SCREW TORQUE VALUES TO BE USED. NRC NOTIFICATION WAS MADE AT 12:18, #1384636 48-HOUR NRC UPDATE #1384722 TEXAS RAILROAD COMMISSION NOTIFICATION WAS MADE AT 12:25

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in