"MAGELLAN PIPELINE COMPANY, LP"

hazardous_liquid Incident, , December 26, 2025

Incident Information

Incident DateDecember 26, 2025
Operator"MAGELLAN PIPELINE COMPANY, LP"
CommodityREFINED AND/OR PETROLEUM PRODUCT (NON-HVL) WHICH IS A LIQUID
Pipeline Typehazardous_liquid

Location

State
Coordinates38.26402, -99.63896

Cause

CauseINCORRECT OPERATION
SubcauseWRONG EQUIPMENT SPECIFIED OR INSTALLED

Casualties

Fatalities0
Injuries0

Costs

Property Damage$11,500
Emergency Response$0
Other Costs$1,500

Location Map

Incident Narrative

"ON DECEMBER 26TH, 2025, ONEOK OPERATORS WERE SHUTTING DOWN THE UNIT 3 MAINLINE PUMP AT THE BURDETT STATION TO COMPLETE MAINTENANCE. DURING THE SHUTDOWN PROCESS, GASOLINE BEGAN RELEASING FROM THE STEM OF THE DISCHARGE VALVE. OPERATIONS NOTIFIED PCC OF THE EVENT AND PCC BEGAN CLOSING THE STATION. ONCE THE STATION WAS ISOLATED OPERATIONS BEGAN PLACING ABSORBENT PADS AND A DRIP PAN TO COLLECT ANY REMAINING PRODUCT LEAKING OUT OF THE VALVE STEM. NOTIFICATION WAS MADE TO THE LOCAL OPERATIONS SUPERVISOR. THE VALVE STEM STOPPED LEAKING WHEN ALL PRESSURE WAS RELIEVED FROM THE LINE. ALL IMPACTED SOIL, GRAVEL AND SAND WAS PLACED INTO A 55-GALLON STEEL DRUM, AND ALL IMPACTED PADS WERE PLACED INTO A SECOND DRUM FOR DISPOSAL. OPERATIONS BEGAN INVESTIGATING AND FOUND THAT DURING A PRIOR REFURBISHMENT OF THE VALVE, IN WHICH THE VALVE STEM WAS REPLACED, ON 10/16/25 THAT THE VALVE STEM INSTALLED WAS 1/4

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.