DCP MIDSTREAM, LP

hazardous_liquid Incident —

Incident Information

Report Date
OperatorDCP MIDSTREAM, LP
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates29.33301, -100.53419

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

NGL TECH ARRIVED AT THE SANDHILLS PINTO CREEK TRAP RECEIVER ON 7/18/24 @ 8:42 AM FOR SCHEDULED ROUTINE MAINTENANCE. THE NGL TECH IMMEDIATELY NOTICED THE CLOSURE DOOR ON THE PIG RECEIVER TRAP HAD AN ICE BALL ON IT. THE TECH BACKED OFF AND MADE NOTIFICATIONS TO FIELD SUPERVISION THEN ISOLATED THE RECEIVER TRAP TO STOP THE LEAK @ 8:51 AM. THE LEAK AMOUNT WAS CALCULATED BY ENGINEERING AND DETERMINED TO BE REPORTABLE TO THE TRRC. THE LEAK WAS REPORTED TO THE TRRC 24 HOUR EMERGENCY LINE @ 9:20 AM. ROOT CAUSE: INVESTIGATION AND LAB ANALYSIS INDICATED THAT PROBABLE ROOT CAUSE WAS DAMAGE TO O-RING WHEN DOOR WAS LAST CLOSED. MISALIGNMENT OF DOOR CAUSED THE O-RING TO BE SLIGHTLY PINCHED UPON CLOSURE. CORRECTIVE ACTION: WELDFIT SERVICE DEPARTMENT WAS CALLED TO EXAMINE THE CLOSURE DOOR. THE WELDFIT SERVICE TECH ADJUSTED THE DOOR FOR REALIGNMENT ON 7/31/24. UPDATE.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in