ATMOS PIPELINE - TEXAS

gas_transmission Incident — — March 19, 2015

Incident Information

Incident DateMarch 19, 2015
OperatorATMOS PIPELINE - TEXAS
CommodityNATURAL GAS
Pipeline Typegas_transmission

Location

State
Coordinates33.12294, -97.02621

Cause

CauseEXCAVATION DAMAGE
SubcauseEXCAVATION DAMAGE BY THIRD PARTY

Casualties

Fatalities0
Injuries0

Costs

Property Damage$25,000
Emergency Response$10,000
Other Costs$0

Location Map

Incident Narrative

THIRD PARTY EXCAVATOR HAD CALLED IN, AND ACCURATE LOCATES WERE PERFORMED. THE THIRD PARTY EXCAVATOR DID NOT CONTACT THE OPERATOR PRIOR TO EXPOSING THE ACTIVE PIPELINE. THE EXCAVATOR EXPOSED AN ABANDONED SECTION OF 16"" PIPE, THEY ASSUMED IT TO BE ACTIVE. THE EXCAVATOR DID NOT CONTACT THE OPERATOR TO CONFIRM IF THE LINE WAS ACTIVE OR NOT. DURING THE BORING PROCESS, THE ACTIVE 12"" LINE WAS STRUCK. THE 12"" LINE WAS 8.5 FEET BELOW THE ABANDONED 16"" LINE.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in