GILL RANCH STORAGE LLC

gas_transmission Incident — — September 3, 2022

Incident Information

Incident DateSeptember 3, 2022
OperatorGILL RANCH STORAGE LLC
CommodityNATURAL GAS
Pipeline Typegas_transmission

Location

State
Coordinates36.78792, -120.23007

Cause

CauseEQUIPMENT FAILURE
SubcauseOTHER EQUIPMENT FAILURE

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$91,000
Other Costs$429,000

Location Map

Incident Narrative

"ENTERED WELL 32-21-106 TO ISOLATE PRESSURE FROM SURFACE TO REPLACE WELLHEAD AS PART OF MAINTENANCE. NOTE, THIS WELLHEAD REPLACEMENT WAS FOR SAFETY ENHANCEMENT AND MECHANICAL INTEGRITY. WHILE RETRIEVING THE WIRELINE TOOL IT BECAME LODGED IN THE 7 1/16"" WELLHEAD PRIMARY ISOLATION VALVE."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in