TENNESSEE GAS PIPELINE COMPANY

gas_transmission Incident, , December 22, 2025

Incident Information

Incident DateDecember 22, 2025
OperatorTENNESSEE GAS PIPELINE COMPANY
CommodityNATURAL GAS
Pipeline Typegas_transmission

Location

State
Coordinates41.85708, -78.00127

Cause

CauseEQUIPMENT FAILURE
SubcauseMALFUNCTION OF CONTROL/RELIEF EQUIPMENT

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$100
Other Costs$0

Location Map

Incident Narrative

"A RELIEF VALVE ON THE HEBRON STORAGE FIELD WITHDRAWAL LINE OPENED AT 1172 PSIG, BELOW ITS SET POINT OF 1250 PSIG. THE PIPELINE WAS ISOLATED AND THE RELIEF VALVE WAS SENT TO A THIRD PARTY FOR INVESTIGATION AND A REBUILD. THE INVESTIGATION IS PENDING."

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in