M&D Construction
Indirect exposure to electricity, greater than 220 volts — Electrocutions, electric shocks — GREAT FALLS, MONTANA
| Employer | M&D Construction | Report ID | 2022098258 |
| Address | 542 Goon Hill Rd | City, State ZIP | GREAT FALLS, MONTANA 59405 |
| Event Date | September 19, 2022 | Outcome | Hospitalized |
| Nature of Injury | Electrocutions, electric shocks | Body Part | BODY SYSTEMS |
| Event Type | Indirect exposure to electricity, greater than 220 volts | Source of Injury | Boom truck, bucket or basket hoist truck |
| Secondary Source | Power lines, transformers, convertors | ||
| Industry (NAICS) | 238910 | Inspection # | — |
| GPS Coordinates | 47.43000, -111.21000 | ||
Incident Narrative
An employee was raising a vacuum truck boom when it contacted an electrical line. He was shocked, the electricity entering his hand and exiting his foot.
Incident Summary
On September 19, 2022, a worker at M&D Construction in GREAT FALLS, MONTANA suffered electrocutions, electric shocks to the body systems. The incident was classified as indirect exposure to electricity, greater than 220 volts, with boom truck, bucket or basket hoist truck identified as the source of injury. The worker was hospitalized.
Context
OSHA has recorded 184 severe injury reports involving "Indirect exposure to electricity, greater than 220 volts" incidents in our database. Browse all Indirect exposure to electricity, greater than 220 volts injuries.
Similar Incidents
Other severe injury reports involving Indirect exposure to electricity, greater than 220 volts events:
| Date | Employer | Location | Nature | Outcome |
|---|---|---|---|---|
| May 10, 2017 | Sunland Construction, Inc | PLAQUEMINE, LOUISIANA | Electrical burns, unspecified | Hosp. |
| Oct 19, 2015 | Orangeco | ARCADIA, FLORIDA | Electrical burns, unspecified | Hosp. |
| Aug 23, 2015 | KV Power | ANDREWS, TEXAS | Amputations | Hosp., Amp. |
| Jan 5, 2021 | Gomez Roofing Co. | LIGHTHOUSE POINT, FLORIDA | Electrical burns, unspecified | Hosp. |
| May 26, 2021 | Gordon Construction Co., Inc. | TALIHINA, OKLAHOMA | Electrical burns, unspecified | Hosp. |
| Jul 30, 2015 | PAR Electrical Contractors, INC | SAINT ELMO, ILLINOIS | Electrocutions, electric shocks | Hosp. |
| Feb 19, 2018 | William Contractor Services | HOUSTON, TEXAS | Electrical burns, unspecified | Hosp. |
| Oct 26, 2018 | Eddling Electric, Inc. | WILLISTON, NORTH DAKOTA | Electrical burns, unspecified | Hosp. |
About This OSHA Report
This is a severe injury report filed with OSHA. Employers are required to report all work-related fatalities and severe injuries within 8 to 24 hours. Browse more reports by industry or state below.