Evest LLC
Direct exposure to electricity, unspecified — Electrical burns, unspecified — WAUKEGAN, ILLINOIS
| Employer | Evest LLC | Report ID | 20191213053 |
| Address | 625 Public Service Road | City, State ZIP | WAUKEGAN, ILLINOIS 60085 |
| Event Date | December 20, 2019 | Outcome | Hospitalized |
| Nature of Injury | Electrical burns, unspecified | Body Part | Hand(s), unspecified |
| Event Type | Direct exposure to electricity, unspecified | Source of Injury | Electrical wiring-building |
| Industry (NAICS) | 424490 | Inspection # | 1452443 |
| GPS Coordinates | 42.36000, -87.87000 | ||
Incident Narrative
An employee was installing a piece of equipment in the facility that involved moving the equipment into place and plugging it into a receptacle. The employee realized the plug and the receptacle did not match. When the employee removed the receptacle from the wall to inspect the wiring an arc flash occurred and burned the employee's hands.
Incident Summary
On December 20, 2019, a worker at Evest LLC in WAUKEGAN, ILLINOIS suffered electrical burns, unspecified to the hand(s), unspecified. The incident was classified as direct exposure to electricity, unspecified, with electrical wiring-building identified as the source of injury. The worker was hospitalized.
Context
OSHA has recorded 730 severe injury reports involving "Direct exposure to electricity, unspecified" incidents in our database. Browse all Direct exposure to electricity, unspecified injuries.
Similar Incidents
Other severe injury reports involving Direct exposure to electricity, unspecified events:
| Date | Employer | Location | Nature | Outcome |
|---|---|---|---|---|
| Apr 12, 2021 | RIGIDPLY RAFTERS, INCORPORATED | RICHLAND, PENNSYLVANIA | Electrocutions, electric shocks | Hosp. |
| Aug 5, 2020 | PACKAGING CORPORATION OF AMERICA | JACKSON, ALABAMA | Electrical burns, unspecified | Hosp. |
| Jul 16, 2020 | Alliant Energy Corporation | DE FOREST, WISCONSIN | Electrocutions, electric shocks | Hosp. |
| Feb 8, 2018 | Southern Company | BAXLEY, GEORGIA | Electrocutions, electric shocks | Hosp. |
| Jun 7, 2019 | Con Edison of New York | FLUSHING, NEW YORK | Electrical burns, unspecified | Hosp. |
| Nov 17, 2022 | Avail Car Sharing | CHICAGO, ILLINOIS | Electrocutions, electric shocks | Hosp. |
| Sep 4, 2016 | Targa Resources | MONT BELVIEU, TEXAS | Second degree electrical burns | Hosp. |
| Sep 28, 2015 | Rio Grande Electric Cooperative, Inc. | BRACKETTVILLE, TEXAS | Electrical burns, unspecified | Hosp. |
About This OSHA Report
This is a severe injury report filed with OSHA. Employers are required to report all work-related fatalities and severe injuries within 8 to 24 hours. Browse more reports by industry or state below.