Technical Service Bulletins
Search 172,063 manufacturer communications covering 879 vehicle makes from 1955 to 2025.
Showing 80 bulletins for PIERCE
98A
Apr 25, 2002
350000 EQUIPMENT
THIS SERVICE BULLETIN PROVIDES UPDATED INSTRUCTIONS FOR INSTALLATION OF THE RE-BUILDABLE STEP CYLINDERS ALONG WITH SOME ADDITIONAL PARTS FOR IMPROVED CYLINDER PERFORMANCE. *TT
99
Sep 20, 2001
062000 ENGINE AND ENGINE COOLING:COOLING SYSTEM
COOLING SYSTEM CONDITIONER SERVICE PROGRAM CAMPAIGN UPDATE. SUBARU 1999 THROUGH 2002 MODEL YEAR 2.5L EQUIPPED VEHICLES. *MR
350
Nov 7, 2000
110000 ELECTRICAL SYSTEM
ROOF RACK CROSS BAR INSTALLATION DURING PRE-DELIVERY SERVICE. *TT
255
Dec 1, 1998
061000 ENGINE AND ENGINE COOLING:ENGINE
DOOR ROD LINKAGE CLIP ASSEMBLY--A NEW REPLACEMENT LINKAGE CLIP ASSEMBLY IS NOW AVAILABLE FOR THE CAB DOOR ON ALL CABS EXCEPT VELOCITY & IMPEL. MODEL YEAR UNKNOWN. *NJ
98
Aug 18, 1998
011000 STEERING: STEERING WHEEL/HANDLE BAR
SUBARU HAS DETERMINED THAT CERTAIN MODELS MAY HAVE BEEN MANUFACTURED WITH AN IMPROPERLY INSTALLED FUEL FILLER HOSE CLAMP. THIS CONDITION COULD RESULT IN A FUEL LEAK. *TT