Technical Service Bulletins
Search 172,063 manufacturer communications covering 879 vehicle makes from 1955 to 2025.
Showing 155 bulletins for KARMA
TB-17-78-13
Feb 16, 2018
136000 VISIBILITY:WINDSHIELD WIPER/WASHER
Passenger Wiper Arm Replacement revised 2-15-18 (repost for bulletin naming convention correction )
CC-18-30-01
Feb 15, 2018
062000 ENGINE AND ENGINE COOLING:COOLING SYSTEM
AC line inspection , check the AC line for clearnace and slide on a nylon sheath to avoid the condition
CC-18-12-01
Feb 5, 2018
060000 ENGINE (PWS)
CC-18-12-01 Oil Change Campaign - some vehicle may show false misfires, change the oil on these first.
CC-18-12-01 REVI
Feb 5, 2018
060000 ENGINE (PWS)
CC-18-12-01 Oil Change Campaign - some vehicle may show false misfires, change the oil on these first revision
SC-18-05-01
Jan 22, 2018
110000 ELECTRICAL SYSTEM
revised tool list- update from the previous 2017 publication old list is obsolete
3.90.16.0043.05
Jan 12, 2018
110000 ELECTRICAL SYSTEM
MY12 revision to the final baseline release, procedure is the same as previously, one module update was eliminated.
TB-18-86-01
Jan 11, 2018
220000 SEATS
Application of a special lubricant to adjoining surfaces of the seat to remedy any squeaking concern
TB-18-20-01
Jan 9, 2018
062100 ENGINE AND ENGINE COOLING:COOLING SYSTEM:RADIATOR ASSEMBLY
Radiator Hose Clamp inspection
CC-18-00-01
Jan 8, 2018
118000 ELECTRICAL SYSTEM:SOFTWARE
Base line 1035 release. Over the air updates to be monitored by the service facility and installed. Instructions and descriptions
SC-18-01-01
Jan 1, 2018
063100 ENGINE AND ENGINE COOLING:EXHAUST SYSTEM:EMISSION CONTROL
EVAP System Inspection
PDI KARMA REVERO
Dec 22, 2017
070000 FUEL SYSTEM, GASOLINE
The PreDelivery Inspection Checklist has been reposted, with a revised line item
PDI-Checklist do
Dec 22, 2017
355200 EQUIPMENT:OTHER:OWNERS/SERVICE/OTHER MANUAL
The PreDelivery Inspection Checklist has been reposted, with a revised line item
Recovery Guide f
Dec 11, 2017
070000 FUEL SYSTEM, GASOLINE
Revised a line item for the PreDelivery inspection to include reporting to technical services group
PO-17-01
Dec 6, 2017
355200 EQUIPMENT:OTHER:OWNERS/SERVICE/OTHER MANUAL
Covered Maintenance Claim Procedure REV 12-6-17
TB-17-70-42
Dec 6, 2017
350000 EQUIPMENT
Chrome Outer Belt Molding Replacement (part supercession, better fit and finish, replace all )
TB-17-76-34
Dec 6, 2017
171100 LATCHES/LOCKS/LINKAGES:DOORS:LATCH
Back Lite Seal Lubricant Application
CC-17-00-29
Nov 30, 2017
118000 ELECTRICAL SYSTEM:SOFTWARE
Baseline 1030 Firmware Release (update and install procedure) (revised with VIN list)