Crossing 717525C

LAVONIA, GEORGIA — Hartwell Railroad Company

Location

CityLAVONIA
StateGEORGIA
StreetEAST MAIN STREET
Coordinates34.44239, -83.11204

Railroad

RailroadHartwell Railroad Company
Number of Tracks
Trains per Day
Max Train Speed25 mph

Warning Devices

Warning Device—
GatesNo

Highway

Highway Speed
PavedNo

Safety Record

Total Accidents5
Total Fatalities0
Total Injuries4

Location Map

Accident History

All recorded accidents at crossing 717525C in LAVONIA, GEORGIA.

YearKilledInjuredVehicle TypeTrain SpeedTimeNarrative
2016 0 0 Auto 10 mph 2:58 PM VEHICLE FAILED TO YIELD AFTER STOPPING AT A STOP SIGN AND STRUCK THE TRAIN WITH ITS RIGHT FRONT FEND ER. THE TRAIN E...
2013 0 2 Auto 15 mph 2:19 PM DRIVER OF VEHICLE FAILED TO STOP AND LOCOMOTIVE STRUCK VEHICLE.
1998 0 2 Auto 30 mph 12:49 PM DRIVER PULLED UP TO CROSSING AND FROZE WHEN SHE SAW TRAIN. STOPPED ON TRACKS AND TRAIN IMPACTED RIG HT FRONT CORNER ...
1998 0 0 Auto 20 mph 3:17 PM DRIVER STOPPED VEHICLE ON EDGE OF TRACKS AND MISJUDGED CLEARANCE DISTANCE.
1975 0 0 Bus 1 mph 10:25 PM

About This Railroad Crossing

Railroad crossing data is maintained by the Federal Railroad Administration (FRA). Crossings are rated by traffic volume, accident history, and safety equipment. Always stop at crossings with active warning signals.

Back to All Crossings More Crossings in GEORGIA