Crossing 247249D

FRANKLIN, CONNECTICUT — New England Central Railroad

Location

CityFRANKLIN
StateCONNECTICUT
CountyNEW LONDON
StreetMURPHY ROAD
Coordinates41.58153, -72.13792

Railroad

RailroadNew England Central Railroad
Max Train Speed25 mph

Warning Devices

Warning Device—
GatesYes

Safety Record

Total Accidents1
Total Fatalities1
Total Injuries0

Location Map

Accident History

All recorded accidents at crossing 247249D in FRANKLIN, CONNECTICUT.

YearRailroadKilledInjuredVehicle TypeTrain SpeedTimeNarrative
1977 Central Vermont Railway 1 0 Auto 25 mph 4:30 PM

About This Railroad Crossing

Railroad crossing data is maintained by the Federal Railroad Administration (FRA). Crossings are rated by traffic volume, accident history, and safety equipment. Always stop at crossings with active warning signals.

Back to All Crossings More Crossings in CONNECTICUT