Crossing 507756F
CHARLEROI, PENNSYLVANIA — Norfolk Southern Railway Company
Location
| City | CHARLEROI |
| State | PENNSYLVANIA |
| Street | SECOND STREET |
| Coordinates | 40.13579, -79.89380 |
Railroad
| Railroad | Norfolk Southern Railway Company |
| Number of Tracks | — |
| Trains per Day | — |
| Max Train Speed | 30 mph |
Warning Devices
| Warning Device | — |
| Gates | No |
Highway
| Highway Speed | — |
| Paved | No |
Safety Record
| Total Accidents | 10 |
| Total Fatalities | 0 |
| Total Injuries | 3 |
Location Map
Accident History
All recorded accidents at crossing 507756F in CHARLEROI, PENNSYLVANIA.
| Year | Killed | Injured | Vehicle Type | Train Speed | Time | Narrative |
|---|---|---|---|---|---|---|
| 1998 | 0 | 0 | Motorcycle | 30 mph | 7:25 AM | TRAIN HIT TRACTOR TRAILER MOVING EAST ACROSS 2ND ST XING.ENGR. SAID HE WAS MOVING AT TRACK SPEED WH EN TRUCK DID NOT... |
| 1998 | 0 | 0 | Motorcycle | 23 mph | 1:42 PM | TRAIN SOUTH HIT MTY FLATBED TRUCK WITH FIXED BOOM ON REAR END OF TRUCK. TRUCK PAUSED AT XING,THEN T RIED TO BEAT TRA... |
| 1998 | 0 | 0 | Van | 27 mph | 11:30 AM | TRAIN UCI253 NORTH ON MON SINGLE TRACK AT 2ND ST XING HIT A MINI VAN MOVING EAST AT THE XING.HORN&L IGHTS WORKING ON... |
| 1997 | 0 | 0 | Bus | 25 mph | 9:55 AM | TRAIN XSG-78E TRAVELING SOUTH ON THE MONT-LINE AT MP 45.8 STRUCK A TRUCK AT 2ND ST., CHARLEROI, PA. ENGINEER - TRUCK ... |
| 1996 | 0 | 1 | Motorcycle | 30 mph | 11:10 AM | — |
| 1995 | 0 | 1 | Motorcycle | 30 mph | 3:40 PM | — |
| 1992 | 0 | 1 | Motorcycle | 28 mph | 9:55 AM | — |
| 1990 | 0 | 0 | Auto | 29 mph | 5:15 PM | — |
| 1988 | 0 | 0 | Auto | 18 mph | 5:50 AM | — |
| 1975 | 0 | 0 | Motorcycle | 9 mph | 9:40 AM | — |
About This Railroad Crossing
Railroad crossing data is maintained by the Federal Railroad Administration (FRA). Crossings are rated by traffic volume, accident history, and safety equipment. Always stop at crossings with active warning signals.