Crossing 272389V
LAKE PARK, FLORIDA — Florida East Coast Railway Company
Location
| City | LAKE PARK |
| State | FLORIDA |
| County | PALM BEACH |
| Street | SILVER BEACH RD |
| Coordinates | 26.79308, -80.07108 |
Railroad
| Railroad | Florida East Coast Railway Company |
| Max Train Speed | 90 mph |
Warning Devices
| Warning Device | — |
| Gates | Yes |
Safety Record
| Total Accidents | 5 |
| Total Fatalities | 0 |
| Total Injuries | 0 |
Location Map
Accident History
All recorded accidents at crossing 272389V in LAKE PARK, FLORIDA.
| Year | Railroad | Killed | Injured | Vehicle Type | Train Speed | Time | Narrative |
|---|---|---|---|---|---|---|---|
| 2025 | Brightline Train | 0 | 0 | Auto | 88 mph | 10:09 PM | BLF730 WAS TRAVELING NORTH ON THE EAST MAIN TRACK WHEN THEY OBSERVED A VEHICLE FOULING THE TRACKS ATMP293.69. THE CRE... |
| 2015 | Florida East Coast Railway Company | 0 | 0 | Auto | 50 mph | 1:59 AM | TRAIN STRUCK UNOCCUPIED VEHICLE THAT WAS STUCK ON THE TRACKS. NO INJURIES WERE SUSTAINED. |
| 2004 | Florida East Coast Railway Company | 0 | 0 | Auto | 40 mph | 4:59 PM | AS TRAIN NEARED THE CROSSING, CREW NOTICED A VEHICLE HALFWAY TURNED INTO THE CROSSING FROM THE WEST SIDE READY TO HEA... |
| 1991 | Florida East Coast Railway Company | 0 | 0 | Auto | 38 mph | 12:40 AM | — |
| 1979 | Florida East Coast Railway Company | 0 | 0 | Auto | 35 mph | 7:20 PM | — |
About This Railroad Crossing
Railroad crossing data is maintained by the Federal Railroad Administration (FRA). Crossings are rated by traffic volume, accident history, and safety equipment. Always stop at crossings with active warning signals.