Crossing 353150H
ALBERTVILLE, ALABAMA — Alabama & Tennessee River Railway LLC
Location
| City | ALBERTVILLE |
| State | ALABAMA |
| Street | W MCKINNEY AVE |
| Coordinates | 34.27272, -86.20992 |
Railroad
| Railroad | Alabama & Tennessee River Railway LLC |
| Number of Tracks | — |
| Trains per Day | — |
| Max Train Speed | 25 mph |
Warning Devices
| Warning Device | — |
| Gates | No |
Highway
| Highway Speed | — |
| Paved | No |
Safety Record
| Total Accidents | 10 |
| Total Fatalities | 1 |
| Total Injuries | 2 |
Location Map
Accident History
All recorded accidents at crossing 353150H in ALBERTVILLE, ALABAMA.
| Year | Killed | Injured | Vehicle Type | Train Speed | Time | Narrative |
|---|---|---|---|---|---|---|
| 2012 | 0 | 0 | Auto | 4 mph | 9:22 AM | RAILWAY TRACK INSPECTOR OCCUPIED CROSSING AND VEHICLE DRIVER FAILED TO STOP AND STRUCK INSPECTION TR UCK. |
| 1998 | 0 | 0 | Auto | 25 mph | 10:30 PM | VEHICLE FAILED TO STOP AND DROVE INTO PATH OF ONCOMING TRAIN. TRAIN STRUCK VEHICLE. NO INJURIES. DAM AGE TO CSXT 6046... |
| 1995 | 1 | 1 | Auto | 23 mph | 5:10 PM | — |
| 1994 | 0 | 0 | Auto | 24 mph | 7:42 AM | — |
| 1993 | 0 | 0 | Bus | 25 mph | 7:47 PM | — |
| 1985 | 0 | 1 | Auto | — | 11:05 PM | — |
| 1982 | 0 | 0 | Auto | 2 mph | 5:35 PM | — |
| 1980 | 0 | 0 | Auto | — | 8:00 PM | — |
| 1977 | 0 | 0 | Bus | 5 mph | 5:45 PM | — |
| 1977 | 0 | 0 | Auto | 20 mph | 6:45 PM | — |
About This Railroad Crossing
Railroad crossing data is maintained by the Federal Railroad Administration (FRA). Crossings are rated by traffic volume, accident history, and safety equipment. Always stop at crossings with active warning signals.