Crossing 199670U
PIEDMONT, SOUTH DAKOTA — Rapid City, Pierre & Eastern Railroad, Inc.
Location
| City | PIEDMONT |
| State | SOUTH DAKOTA |
| Street | Stagebarn Canyon Road |
| Coordinates | 44.19837, -103.34614 |
Railroad
| Railroad | Rapid City, Pierre & Eastern Railroad, Inc. |
| Number of Tracks | — |
| Trains per Day | — |
| Max Train Speed | 25 mph |
Warning Devices
| Warning Device | — |
| Gates | No |
Highway
| Highway Speed | — |
| Paved | No |
Safety Record
| Total Accidents | 4 |
| Total Fatalities | 0 |
| Total Injuries | 5 |
Location Map
Accident History
All recorded accidents at crossing 199670U in PIEDMONT, SOUTH DAKOTA.
| Year | Killed | Injured | Vehicle Type | Train Speed | Time | Narrative |
|---|---|---|---|---|---|---|
| 2014 | 0 | 2 | Bus | 25 mph | 4:00 PM | B02-12 WAS TRAVELING NORTHBOUND WITH 3 LOCOMOTIVES AND 28 EMPTIES FOR 913 TONS, LOCOMOTIVES WERE DM E 6094 (REAR), D... |
| 2012 | 0 | 0 | Motorcycle | 23 mph | 11:50 AM | ASSIGNMENT B05-18 CAME IN CONTACT WITH SEMI TRACTOR/TRAILER (LOAD OF SPEED) AT STAGEBARN CANYON CROS SING. WHISTLE S... |
| 2005 | 0 | 2 | Auto | 25 mph | 8:20 PM | HIGHWAY DRIVER DID NOT STOP FOR TRAIN AND WAS HIT ON THE PASSENGER SIDE BY THE LEAD UNIT. DRIVER WA S INJURED. 3 YE... |
| 1999 | 0 | 1 | Pick-up truck | 20 mph | 4:45 AM | PICKUP DRIVER WAS LOOKING AT THE CLOUDS IN THE WESTERN SKY, HE WAS CONCERNED THAT THE CONCRETE PROJE CT HE WAS WORKIN... |
About This Railroad Crossing
Railroad crossing data is maintained by the Federal Railroad Administration (FRA). Crossings are rated by traffic volume, accident history, and safety equipment. Always stop at crossings with active warning signals.