Crossing 092570P
ROCHESTER, WASHINGTON — Puget Sound & Pacific Railroad Company
Location
| City | ROCHESTER |
| State | WASHINGTON |
| County | THURSTON |
| Street | 191ST AVE. SW. |
| Coordinates | 46.81110, -123.05605 |
Railroad
| Railroad | Puget Sound & Pacific Railroad Company |
| Max Train Speed | 40 mph |
Warning Devices
| Warning Device | — |
| Gates | No |
Safety Record
| Total Accidents | 2 |
| Total Fatalities | 0 |
| Total Injuries | 0 |
Location Map
Accident History
All recorded accidents at crossing 092570P in ROCHESTER, WASHINGTON.
| Year | Killed | Injured | Vehicle Type | Train Speed | Time | Narrative |
|---|---|---|---|---|---|---|
| 1999 | 0 | 0 | Pick-up truck | 40 mph | 8:35 PM | A PICK UP TRUCK RAN THE STOP SIGN IN FRONT OF THE "CENTRALIA TURN" AT M.P. 191ST ST CROSSING. THE T RAIN STRUCK THE ... |
| 1978 | 0 | 0 | Auto | 40 mph | 3:15 PM | — |
About This Railroad Crossing
Railroad crossing data is maintained by the Federal Railroad Administration (FRA). Crossings are rated by traffic volume, accident history, and safety equipment. Always stop at crossings with active warning signals.