NUSTAR PIPELINE OPERATING PARTNERSHIP L.P.

hazardous_liquid Incident — — December 9, 2011

Incident Information

Incident DateDecember 9, 2011
OperatorNUSTAR PIPELINE OPERATING PARTNERSHIP L.P.
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates30.79696, -91.91989

Cause

CauseMATERIAL FAILURE OF PIPE OR WELD
SubcauseDESIGN-, CONSTRUCTION-, INSTALLATION-, OR FABRICATION-RELATED

Casualties

Fatalities0
Injuries0

Costs

Property Damage$97,000
Emergency Response$10,000
Other Costs$0

Location Map

Incident Narrative

A PASSERBY IN A VEHICLE NOTICED AN AMMONIA ODOR AND STOPPED TO CALL NUSTAR CONTROL CENTER AT APPROXIMATELY 07:24 ON 12/9/2011. AT 08:02 LOCAL OPERATOR ARRIVED ON-SITE AND NOTICED MINOR AMMONIA ODORS AND NO VISUAL SIGNS AF AMMONIA. AT 10:40 SUPERVISOR SHOWS UP AND NOTICES SOME SIGNS OF AMMONIA COMING FROM THE GROUND. AT THIS TIME THE LINE WAS BLOCKED IN BY OPERATIONS IN A MANNER TO SAFELY LOWER THE OPERATING PRESSURE FROM 1000 PSI TO 170 PSI. THE LEAKING WAS NOTED AS STOPPED AT 11:29 BY OPERATIONS PERSONNEL. BASED ON EPA REPORTABLE QUANTITY OF 100 LBS. FOR AMMONIA, NRC WAS NOTIFIED. A DOUBLE STOPPLE WAS INSTALLED AND THE LINE WAS REPLACED. THE CUT OUT STOPPLE WAS SENT OFF FOR METALLURGICAL ANALYSIS. CONTAMINATED SOILS WERE PLACED IN ROLL OFFS FOR FUTURE DISPOSAL AT A LANDFILL. *UPDATE - PER METALLURGICAL ANALYSIS - THE LEAK WAS CAUSED BY A FATIGUE CRACK THAT DEVELOPED IN THE LONGITUDINAL SEAM WELD OF THE STOPPLE FITTING. THE CRACK INITIATED AT AN AREA OF INADEQUATE WELD PENETRATION, A FABRICATION DEFECT CREATED WHEN THE FITTING WAS INSTALLED ON THE PIPELINE.