"ENBRIDGE ENERGY, LIMITED PARTNERSHIP"
hazardous_liquid Incident — — March 5, 2015
Incident Information
| Incident Date | March 5, 2015 |
| Operator | "ENBRIDGE ENERGY, LIMITED PARTNERSHIP" |
| Commodity | CRUDE OIL |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 46.35992, -89.50680 |
Cause
| Cause | EQUIPMENT FAILURE |
| Subcause | OTHER EQUIPMENT FAILURE |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $18,399 |
| Emergency Response | $0 |
| Other Costs | $0 |
Location Map
Incident Narrative
"ON MARCH 5 AT APPROXIMATELY 3:15 CST, WHILE REVIEWING AN ENGINEERING PROJECT AT THE GOGEBIC STATION, TWO ENBRIDGE PERSONNEL DISCOVERED APPROXIMATELY 8 GALLONS OF CRUDE OIL IN/AROUND THE LINE 5 UNIT 1 DISCHARGE VALVE. THE EDMONTON CONTROL CENTER WAS IMMEDIATELY CONTACTED, LINE 5 UNIT 1 WAS LOCKED OUT AND THE DECISION MADE TO BYPASS THE GOGEBIC STATION. ESCANABA PLM WAS DISPATCHED TO INVESTIGATE THE FAILURE, DETERMINE NECESSARY REPAIRS, AND BEGIN CLEANUP. IT WAS DETERMINED THAT THE STEM SEAL FAILED DUE TO NORMAL WEAR AND TEAR. ONCE THE STEM SEAL WAS REPLACED FRIDAY MARCH 6, GOGEBIC STATION WAS RETURNED TO NORMAL OPERATION. LESS THAN ONE CUBIC YARD OF CONTAMINATED SOIL WAS DISPOSED OF AT AN APPROVED DISPOSAL FACILITY."