EXXONMOBIL PIPELINE CO

hazardous_liquid Incident — — June 2, 2016

Incident Information

Incident DateJune 2, 2016
OperatorEXXONMOBIL PIPELINE CO
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates29.72056, -95.13222

Cause

CauseCORROSION FAILURE
SubcauseEXTERNAL CORROSION

Casualties

Fatalities0
Injuries0

Costs

Property Damage$0
Emergency Response$150,000
Other Costs$0

Location Map

Incident Narrative

"THE FAILURE LOCATION APPEARS TO BE UNDER, OR VERY CLOSE TO A CENTERPOINT TRANSMISSION TOWER. DUE TO SAFETY CONCERNS EMPCO WILL NOT EXCAVATE CLOSE ENOUGH TO THE TOWER TO EXPOSE THE LEAK SITE. EMPCO IS CURRENTLY DECIDING NEXT STEPS. THE PIPELINE SEGMENT IS CURRENTLY ISOLATED AND FILLED WITH NITROGEN. PART C QUESTION 3 PIPE BODY IS ASSUMED. AUGUST 2018 UPDATE - EMPCO WAS UNABLE TO EXCAVATE THE FAILURE POINT DUE TO THE PROXIMITY OF A POWER LINE TOWER. A TETHERED ILI WAS USED TO INSPECT THE SEGMENT. DATA FROM THE TOOL SUGGESTS DISBONDING OF X-TRU COATING ON THE EFFECTED JOINT. THE LINE SEGMENT WAS LEFT IN PLACE AND GROUT FILLED. NEW FBE-COATED PIPE WAS INSTALLED AND RECOMMISSIONED ON 8/7/2017. JANUARY 21, 2019 UPDATE - AT PHMSA'S REQUEST CHANGED PART A, 14B FROM A DATE OF 8/7/18 TO 8/7/17, AND CHANGED PART C, 3A FROM 6.625 TO 6.0. CHANGED PREPARERS INFORMATION. REPORT IS FINAL."