SHELL PIPELINE CO., L.P.
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | SHELL PIPELINE CO., L.P. |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 30.47387, -91.04322 |
Cause
| Cause | INCORRECT OPERATION |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
CONTROL CENTER WAS NOTIFIED BY THE EAST BATON ROUGE FIRE DEPT. HAZ MAT TEAM OF A FOG COMING FROM A VALVE SITE. THE CONTROLLER SHUT DOWN THE MAINLINE PIPELINE FEEDING THE 12 INCH LATERAL AND CLOSED THE BLOCK VALVE. THIS STOPPED THE RELEASE FROM THE VALVE. VAVLE IS A 12"" EXPANDING GATE VALVE ANSI 600. THE VALVE WAS REPLACED WITH A NEW VALVE. VALVE WAS TAKEN TO INSPECT FOR CAUSE. THE VALVE BODY VENT BLEEDER WAS LOOSENED AND NOT SUBSEQUENTLY RE-TIGHTENED. PROCEDURE FOR PERFORMING THIS MAINTENANCE DO NOT ADDRESS THIS THREAT. THE PROCEDURE WILL BE UPDATED FOR STANDARD PROCEDURE FOR VALVE PACKING INJECTION/REPAIR. UPDATE VALVE TECHNICAL SPECIFICATION TO CLARIFY SCHEDULE OF VALVE EXTERNAL FITTINGS.