SUNOCO PIPELINE L.P.

hazardous_liquid Incident —

Incident Information

Report Date
OperatorSUNOCO PIPELINE L.P.
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates34.32184, -100.24492

Cause

CauseCORROSION FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

__ AT APPROXIMATELY 9:20 ON FEBRUARY 11, 2016 SUNOCO WAS ALERTED BY THE AERIAL PATROL PILOT OF A POSSIBLE RELEASE ON THE TRUSCOTT TO CHILDRESS SEGMENT OF THE HAWLEY TO DIXON CRUDE SYSTEM. CONTROL CENTER WAS IMMEDIATELY NOTIFIED AND THE LINE WAS SHUT DOWN AT 09:32. FIELD PERSONNEL WERE DISPATCHED TO THE AREA AND CONFIRMED THE RELEASE AT APPROXIMATELY 11:50. UPSTREAM AND DOWNSTREAM MANUAL VALVES WERE CLOSED BY FIELD PERSONNEL TO ISOLATE THE FAILURE POINT BY 12:30. THE RELEASE DID IMPACT APPROXIMATELY 0.25 MILES OF AN INTERMITTENT, UNNAMED TRIBUTARY TO SHORES CREEK. NRC WAS NOTIFIED AT 13:08 (1140271) AND TX RRC PIPELINE SAFETY WAS NOTIFIED AT 13:25 (INCIDENT NO. 1315). ADDITIONAL COMPANY PERSONNEL AND CONTRACTORS WERE DISPATCHED TO THE LEAK SITE. EQUIPMENT ARRIVED ON SITE AND EXCAVATION BEGAN AT APPROXIMATELY 17:30. THE FAILURE POINT WAS EXCAVATED, PREPPED AND CLAMPED AT APPROXIMATELY 01:00 ON FEBRUARY 12, 2016. THE FAILED JOINT OF PIPE WAS CUT OUT AND REPLACED, A STATIC PRESSURE TEST WAS CONDUCTED AND THE LINE RESTARTED ON FEBRUARY 15, 2016.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.