DEW POINT MIDSTREAM, LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorDEW POINT MIDSTREAM, LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates31.36991, -103.67267

Cause

CauseCORROSION FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

PLANT OPERATOR WAS NOTIFIED OF POSSIBLE LEAK AT APPROXIMATELY 14:20 2/26/2022. PLANT OPERATOR NOTIFIED HSE AND DESCRIBED THE LEAK AS BEING ON PLANT PIPE AND THE PLANT DECIDED TO BLOCK IN THE PIPELINE AT THE FIRST BLOCK VALVE. I WAS FIRST NOTIFIED AT 15:37 THAT THE LEAK WAS BEFORE THE PIPE REACHED THE PIG LAUNCHER. AT 16:25 I WAS NOTIFIED THAT THE LEAK WAS JUST PAST THE PIG LAUNCHER BUT STILL INSIDE THE PLANT FENCE. ONCE I WAS NOTIFIED THAT THE LEAK WAS ON A PIPELINE, I MADE NOTIFICATIONS TO THE TEXAS RRC AND NRC AND THE PLANT OPERATORS HAD ALREADY BLOCKED IN THE PIPELINE THAT WAS LEAKING. ONCE THE PIPELINE WAS EXPOSED,A PIN HOLE WAS DISCOVERED AND DUE TO EQUIPMENT CONFIGURATION AND THE VICINITY OF THE LEAK TO SUPPORTS, IT WAS DECIDED TO REPLACE APPROXIMATELY 80 FEET OF PIPE. THE PIPE WITH THE PIN HOLE WAS SENT TO PERMIAN BASIN METALLURGICAL LABORATORIES FOR FAILURE ANALYSIS. THE RESULTS OF THE METALLURGICAL ANALYSIS SHOWED MICROBIALLY INDUCED CORROSION (MIC). THE DEW POINT NGL LINE HAS A CLOSE INTERVAL SURVEY (CIS) SCHEDULED TO START MAY 23. THE RESULTS OF THE CIS WILL DETERMINE IF ANY FURTHER INSPECTIONS WILL BE SCHEDULED.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in