ENBRIDGE HOLDINGS (GRAY OAK) LLC

hazardous_liquid Incident —

Incident Information

Report Date
OperatorENBRIDGE HOLDINGS (GRAY OAK) LLC
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates31.75694, -103.18917

Cause

CauseCORROSION FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

ON MAY 9, 2023, AT APPROXIMATELY 10:38 AM CDT A RELEASE WAS DISCOVERED AT THE WINK TERMINAL IN THE BOOSTER PUMP AREA. THE CONTROL CENTER WAS IMMEDIATELY NOTIFIED, AND THE LINE WAS SHUT DOWN AND WINK TERMINAL WAS ISOLATED UNTIL THE SOURCE OF THE RELEASE COULD BE DETERMINED. ENBRIDGE PERSONNEL AND CONTRACTORS WERE MOBILIZED TO THE SITE FOR CLEAN UP AND EXCAVATION TO IDENTIFY THE SOURCE. APPROXIMATELY 4 BARRELS OF CRUDE OIL WAS RELEASED AND CONTAINED WITHIN THE TERMINAL FACILITY. THE NRC WAS NOTIFIED ON MAY 9, 2023, AT 12:51 PM CDT (NRC# 1366778) WHEN IT WAS DETERMINED THAT THE COSTS WOULD EXCEED THE NRC REPORTING THRESHOLD. A 48-HOUR UPDATE TO THE NRC WAS MADE ON MAY 11, 2023, AT 10:13 AM CDT (NRC# 1366960). THE SOURCE OF THE RELEASE WAS IDENTIFIED AS A 16"" RECIRCULATION LINE IN THE BOOSTER PUMP MANIFOLD. THE SECTION OF PIPE WAS SLEEVED AND RETURNED TO SERVICE. ON JUNE 23, 2023, THE AFFECTED SECTION OF PIPE WAS REMOVED AND SENT TO A THIRD-PARTY FOR A METALLURGICAL ANALYSIS. AFTER FURTHER INVESTIGATION THE CAUSE OF THE RELEASE WAS DETERMINED TO BE DUE TO INTERNAL CORROSION PITTING ON THE BOTTOM SIDE OF THE RECIRCULATION LINE. THE RESULTS OF THE ANALYSIS INDICATE THAT THE INTERNAL CORROSION OBSERVED ON THE PIPE OCCURRED DUE TO MICROBIOLOGICALLY INFLUENCED CORROSION THAT WAS ACCELERATED BY THE HYPERSALINE CONDITIONS AND PRESENCE OF OXYGEN. SITE REMEDIATION PROCEEDED UNTIL EARLY AUGUST 2023, WITH CONTAMINATED SURFACE SOIL BEING REMOVED FROM AROUND THE BOOSTER PUMP AREA. SEVERAL ACTION PLANS HAVE BEEN CREATED TO ENHANCE INTEGRITY MANAGEMENT ACTIVITIES ON SIMILAR PIPE SEGMENTS AT OTHER FACILITIES ON THE GRAY OAK SYSTEM.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in