"ONEOK NGL PIPELINE, LLC"

hazardous_liquid Incident — — October 14, 2025

Incident Information

Incident DateOctober 14, 2025
Operator"ONEOK NGL PIPELINE, LLC"
CommodityHVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBI
Pipeline Typehazardous_liquid

Location

State
Coordinates30.09770, -94.95220

Cause

CauseMATERIAL FAILURE OF PIPE OR WELD
Subcause"DESIGN-, CONSTRUCTION-, INSTALLATION-, OR FABRICATION-RELATED"

Casualties

Fatalities0
Injuries0

Costs

Property Damage$64,325
Emergency Response$350
Other Costs$0

Location Map

Incident Narrative

"AT 23:41 ON 10/14/25, PCC RECEIVED AN ALARM ON A GAS DETECT AT THE ARBUCKLE II DAYTON PUMP STATION. AN AREA OPERATOR WAS DISPATCHED AND UPON ARRIVAL IDENTIFIED A LEAK ORIGINATING FROM UNDERGROUND. THE STATION WAS SHUT DOWN, AND THE SUSPECTED SEGMENT WAS ISOLATED AND DE-INVENTORIED. UPON EXCAVATION, NON-DESTRUCTIVE EVALUATION TESTING DETERMINED THE SOURCE OF THE LEAK WAS A CRACK IN A FILLET WELD ON FLARE PIPING. THE COMPLETE WELD WAS REMOVED, AND A NEW WELD WAS MADE PER ONEOK WELDING PROCEDURE. THE CRACK WAS EVALUATED AND IS ATTRIBUTED TO INCOMPLETE PENETRATION IN THE FIRST PASS COMBINED WITH AN ELEMENT OF MECHANICAL STRESS. NRC WAS NOTIFIED ON 10/17/25 ONCE DETERMINATION WAS MADE THAT THE COST WOULD EXCEED $50,000."