ELEVATION MIDSTREAM

hazardous_liquid Incident —

Incident Information

Report Date
OperatorELEVATION MIDSTREAM
Commodity—
Pipeline Typehazardous_liquid

Location

State
Coordinates40.20235, -104.60803

Cause

CauseEQUIPMENT FAILURE
Subcause—

Casualties

Fatalities0
Injuries0

Costs

Property Damage
Lost Commodity
Public/Private Damage
Emergency Response
Environmental Remediation
Other Costs

Location Map

Incident Narrative

WHILE PREPARING THE PIPELINE TO SEND THE ILI TOOL DOWN THE LINE; OPERATORS CONTACTED MVP CONTROL ROOM TO LET THEM KNOW THAT THEY WERE PLACING THE VALVES IN LOCAL OPERATION. MVP CONTROL ROOM OPERATED THE MAIN VALVE TO THE CLOSED POSITION, OPENED UP BYPASS, CLOSED KICKER VALVE, CONTROL ROOM CONFIRMED VALVES 0% OPEN AND THEN ON-SITE OPERATIONS CONFIRMED THAT THE VALVES WERE CLOSED THEN PUT IN MANUAL OPERATIONS BY OPERATIONS. DRAINED BARREL TO SUMP . BYPASS WAS OPEN EVERYTHING ELSE WAS CLOSED. WHEN CONTROL ROOM STARTED THE FLOW; LIQUID BEGAN SPRAYING OUT OF KICKER VALVE. OPERATIONS IMMEDIATELY CALLED CONTROL ROOM TO STOP FLOW.

About This Pipeline Incident

Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.

Back to All Incidents More Incidents in