SEA ROBIN PIPELINE CO
gas_transmission Incident — — January 24, 2025
Incident Information
| Incident Date | January 24, 2025 |
| Operator | SEA ROBIN PIPELINE CO |
| Commodity | NATURAL GAS |
| Pipeline Type | gas_transmission |
Location
| State | |
| Coordinates | 28.61513, -90.25118 |
Cause
| Cause | MATERIAL FAILURE OF PIPE OR WELD |
| Subcause | "DESIGN-, CONSTRUCTION-, INSTALLATION-, OR FABRICATION-RELATED" |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $2,457,394 |
| Emergency Response | $107,500 |
| Other Costs | $0 |
Location Map
Incident Narrative
"AT APPROXIMATELY 1051 ON 01/24/25, OPERATIONS RECEIVED A CALL FROM A 3RD PARTY REPORTING BUBBLES IN THE AREA NEAR THE SEA ROBIN 319B-2400 IN SOUTH TIMBALIER 151 (ST 151). NRC WAS CALLED REPORTING THE BUBBLES IN ST151 (NRC#1421791, 48HR UPDATE#1421896). AN OVERFLIGHT WAS CONDUCTED TO VERIFY THE LOCATION OF THE BUBBLES. PIPELINE WAS ISOLATED ON 01/24/25 AT 1330. OVERFLIGHTS WERE CONDUCTED DAILY TO MONITOR THE AREA FOR ANY CHANGES AS WEATHER PERMITTED. DUE TO WEATHER CONDITIONS, SEA STATES AND DSV AVAILABILITY, THE REPAIR CONTRACTOR WAS NOT ABLE TO DEPLOY UNTIL 4/24/25. DIVERS VERIFIED LEAK LOCATION ON 04/25/25 AT 0215 ON THE SEA ROBIN 319B-2400 PIPELINE. AN ATTEMPT WAS MADE TO REPAIR THE LEAK LOCATION. THE REPAIR WAS NOT COMPLETED DUE TO THE CLAMP NOT SEALING. A SPECIALIZED CLAMP IS ON ORDER. THE PIPELINE REMAINS ISOLATED UNTIL THE CLAMP CAN BE INSTALLED. THE 48HR NRC NOTIFICATION WAS UPDATED ON 04/25/25 AT 0859 TO REFLECT THE CHANGE FROM UNKNOWN OWNER TO SEA ROBIN PIPELINE. (#1429408) UPDATE: A NEW SPOOL WAS FABRICATED AND INSTALLED ON 10-15-2025. LINE WAS PUT BACK INTO SERVICE ON 10-19-2025. UPDATE: DURING THE INVESTIGATION, THE DIVER NOTED THAT THE CONCRETE COATING WAS INTACT. WHEN THE DIVER REMOVED THE CONCRETE COATING, IN SEARCH OF FINDING EXACTLY WHERE THE LEAK WAS COMING FROM, A DENT WAS FOUND IN THE PIPE. AT THE TOP OF THE DENT, 3 PINHOLES WERE FOUND. DUE TO FATIGUE OF THE DENT, SINCE THE CONCRETE COATING WAS NOT DAMAGED, THE DAMAGE MUST HAVE OCCURRED PRIOR TO OR DURING THE CONCRETE COATING INSTALLATION. THE PIPE IS INTERNALLY COATED, AND AN INTERNAL INSPECTION WAS PERFORMED WHICH SHOWED NO INTERNAL CORROSION. 12-12-25"
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.