Scour Critical Bridges in Washington
516 bridges in Washington at risk from water erosion around foundations.
Scour Critical Bridges
Scour is the erosion of soil and rock around a bridge's foundation caused by moving water. When foundations are exposed or undermined, a bridge can collapse even if its deck and superstructure are in good condition. Scour is the leading cause of bridge failures in the US. These 516 bridges in Washington have been identified as vulnerable to scour damage.
| Bridge | State | Scour Status | Condition | Year Built | ADT |
|---|---|---|---|---|---|
| FOSSIL CREEK | Washington | Scour Critical — Countermeasures Installed | Poor | 1934 | 1,283 |
| GLACIER CREEK | Washington | Scour Critical — Countermeasures Installed | Poor | 1956 | 1,283 |
| COAL CREEK | Washington | Scour Critical — Countermeasures Installed | Good | 1971 | 1,283 |
| EARLY WINTERS CREEK | Washington | Scour Critical — Countermeasures Installed | Poor | 1964 | 1,280 |
| PERRY CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1958 | 1,273 |
| E FOSTER CREEK | Washington | Scour Critical — Countermeasures Installed | Good | 1950 | 1,239 |
| E FOSTER CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1950 | 1,239 |
| W FOSTER CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1950 | 1,239 |
| ALDER CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1937 | 1,200 |
| CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1937 | 1,200 |
| CINEBAR CREEK | Washington | Scour Critical — Countermeasures Installed | Good | 1946 | 1,200 |
| N FK SNOQUALMIE R | Washington | Scour Critical — Countermeasures Installed | Poor | 1951 | 1,200 |
| WILSON CR | Washington | Scour Critical — Countermeasures Installed | Fair | 1947 | 1,181 |
| WADDELL CREEK | Washington | Scour Critical — Countermeasures Installed | Good | 1969 | 1,164 |
| BRADEN CREEK | Washington | Scour Critical — Countermeasures Installed | Good | 1931 | 1,151 |
| LAKE CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1950 | 1,112 |
| COWLITZ RIVER | Washington | Scour Critical — Countermeasures Installed | Fair | 1949 | 1,109 |
| PUGET SOUND @ TAHLEQUAH | Washington | Scour Critical — Countermeasures Installed | Fair | 1994 | 1,106 |
| KALALOCH CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1930 | 1,079 |
| DESCHUTES RIVER | Washington | Scour Critical — Countermeasures Installed | Fair | 1956 | 1,079 |
| POSSESSION SOUND | Washington | Scour Critical — Countermeasures Installed | Good | 2003 | 1,078 |
| CONNOR CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1975 | 1,007 |
| DELEZENNE CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1971 | 1,007 |
| STILLWATER CR | Washington | Scour Critical — Countermeasures Installed | Good | 1963 | 994 |
| KALAMA RIVER | Washington | Scour Critical — Countermeasures Installed | Good | 1952 | 975 |
| SULLIVAN CREEK | Washington | Scour Critical — Countermeasures Installed | Poor | 1927 | 949 |
| BOISE CREEK | Washington | Scour Critical — Countermeasures Installed | Poor | 1956 | 947 |
| BUCK CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1960 | 923 |
| COLUMBIA RIVER | Washington | Scour Critical — Countermeasures Installed | Poor | 1948 | 904 |
| MILK CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1939 | 881 |
| BULLMAN CREEK | Washington | Scour Critical — Countermeasures Installed | Good | 1960 | 881 |
| MILL CREEK | Washington | Scour Critical — Countermeasures Installed | Good | 1971 | 879 |
| WYNOOCHEE RIVER | Washington | Scour Critical — Countermeasures Installed | Fair | 1969 | 861 |
| DESCHUTES RIVER | Washington | Scour Critical — Countermeasures Installed | Good | 1982 | 851 |
| E TWIN R | Washington | Scour Critical — Countermeasures Installed | Good | 1952 | 841 |
| NO.FK NEWAUKUM RIVER | Washington | Scour Critical — Countermeasures Installed | Fair | 1960 | 839 |
| N BRANCH CHELATCHIE CR | Washington | Scour Critical — Countermeasures Installed | Poor | 1953 | 838 |
| MATNEY CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1930 | 814 |
| MIDDLE BR WILDCAT CREEK | Washington | Scour Critical — Countermeasures Installed | Poor | 1951 | 804 |
| MIDDLE BRANCH WILDCAT CK | Washington | Scour Critical — Countermeasures Installed | Poor | 1951 | 804 |
| NORTH FORK | Washington | Scour Critical — Countermeasures Installed | Fair | 1930 | 800 |
| KALAMA RIVER | Washington | Scour Critical — Countermeasures Installed | Fair | 1958 | 795 |
| NEWAUKUM RIVER | Washington | Scour Critical — Countermeasures Installed | Fair | 1970 | 750 |
| ELOCHOMAN RIVER | Washington | Scour Critical — Countermeasures Installed | Good | 1963 | 726 |
| MISSION CREEK | Washington | Scour Critical — Countermeasures Installed | Poor | 1960 | 725 |
| SAN POIL R | Washington | Scour Critical — Countermeasures Installed | Poor | 1931 | 705 |
| MOX CHEHALIS CREEK | Washington | Scour Critical — Countermeasures Installed | Fair | 1966 | 685 |
| NEWAUKUM RIVER | Washington | Scour Critical — Countermeasures Installed | Fair | 1973 | 674 |
| SALMON CREEK | Washington | Scour Critical — Countermeasures Installed | Good | 2020 | 659 |
| N FORK NOOKSACK RIVER | Washington | Scour Critical — Countermeasures Installed | Fair | 1957 | 649 |
Scour Critical Rating Codes
| Code 2 — Unaddressed | Bridge is scour critical with no countermeasures installed. The foundation is vulnerable and no protective action has been taken. |
| Code 3 — Countermeasures Installed | Protective measures (riprap, sheet piling, etc.) have been installed to reduce scour risk, but the bridge remains classified as scour critical. |
| Code 6 — Countermeasures Ineffective | Protective measures were installed but have been assessed as ineffective. The bridge requires re-evaluation and additional action. |
About Scour Critical Bridges
Scour critical bridges have been identified through underwater inspection or analysis as having foundations that are unstable or could become unstable during flood conditions. FHWA requires action plans for all scour critical bridges. Famous scour failures include the 1987 Schoharie Creek Bridge collapse in New York.