Browse Bridge Database
56,951 bridges in the FHWA National Bridge Inventory in Texas.
National Bridge Inventory Database
Browse 56,951 bridges from the Federal Highway Administration National Bridge Inventory. Filter by state, condition rating, or search by name and location.
| Bridge | Location | Condition | Year Built | Length | ADT |
|---|---|---|---|---|---|
| Meyers Lane | Texas | Good | 1972 | 56.4 m | 47,401 |
| Craven Ave | Texas | Good | 2003 | 82.3 m | 47,401 |
| Blieders Crk & River Rd. | Texas | Good | 2023 | 399.1 m | 47,350 |
| Blieders Crk & River Rd. | Texas | Good | 2023 | 408.6 m | 47,350 |
| PERSHING DR | Texas | Good | 1978 | 80.8 m | 47,227 |
| IH 69 NB RP G CITY ST | Texas | Fair | 1972 | 492.6 m | 47,212 |
| PARKERVILLE RD | Texas | Good | 2010 | 94.5 m | 47,177 |
| PARKERVILLE RD | Texas | Good | 2008 | 94.5 m | 47,177 |
| Spur 303 | Texas | Fair | 1963 | 65.8 m | 47,144 |
| Ramey Ave | Texas | Fair | 1963 | 47.9 m | 47,144 |
| W FK SAN JACINTO RI | Texas | Fair | 1994 | 1,449.6 m | 47,121 |
| San Jacinto Relief | Texas | Good | 2021 | 152.4 m | 47,121 |
| San Jacinto River | Texas | Good | 2021 | 1,457.2 m | 47,121 |
| SAN JACINTO RI E REL | Texas | Good | 1994 | 152.4 m | 47,121 |
| San Jacinto Riv W Relief | Texas | Good | 2021 | 91.4 m | 47,121 |
| SAN JACINTO RI W REL | Texas | Good | 1994 | 91.4 m | 47,121 |
| DART | Texas | Good | 2011 | 244.8 m | 47,110 |
| CESAR CHAVEZ ROAD | Texas | Good | 2002 | 69.5 m | 47,091 |
| FM 907 (ALAMO RD) | Texas | Good | 2002 | 69.5 m | 47,091 |
| FM 907 (ALAMO RD) | Texas | Good | 2002 | 69.5 m | 47,091 |
| CESAR CHAVEZ ROAD | Texas | Good | 2002 | 69.5 m | 47,091 |
| DRAIN | Texas | Fair | 1979 | 18.6 m | 46,939 |
| E FORK MCKAMY BRANCH | Texas | Fair | 1973 | 16.2 m | 46,910 |
| SH 183 & LP 12 | Texas | Good | 2018 | 828.8 m | 46,900 |
| ROYAL LN | Texas | Fair | 1979 | 69.2 m | 46,882 |
| ROYAL LN | Texas | Fair | 1979 | 69.2 m | 46,882 |
| DART RR & COUNTY LINE RD | Texas | Fair | 1979 | 144.2 m | 46,882 |
| SUGAR RD | Texas | Good | 1966 | 47.2 m | 46,866 |
| DRAW | Texas | Good | 1960 | 17.1 m | 46,866 |
| Indian Creek | Texas | Fair | 1963 | 19.8 m | 46,813 |
| BUFFALO BAYOU | Texas | Fair | 2004 | 146.3 m | 46,700 |
| MIDWAY DRIVE | Texas | Good | 2006 | 63.7 m | 46,685 |
| MIDWAY DRIVE | Texas | Good | 2006 | 63.7 m | 46,685 |
| Leon Creek | Texas | Good | 1987 | 67.1 m | 46,681 |
| MIDLAND DRAW | Texas | Fair | 1982 | 24.4 m | 46,665 |
| HCFCD #0111-00-00 | Texas | Good | 2002 | 10.1 m | 46,663 |
| FM 1314 | Texas | Good | 2007 | 88.4 m | 46,640 |
| FM 5 | Texas | Fair | 1978 | 78.6 m | 46,568 |
| SWANSEE ST | Texas | Good | 1969 | 49.1 m | 46,547 |
| SWANSEE ST | Texas | Good | 1969 | 49.1 m | 46,547 |
| TRE/FTG RD | Texas | Fair | 1963 | 91.4 m | 46,524 |
| KINGWOOD DR | Texas | Good | 2007 | 99.7 m | 46,513 |
| FM 529 | Texas | Fair | 1989 | 251.8 m | 46,500 |
| SH 183 | Texas | Fair | 2007 | 768.1 m | 46,500 |
| IH 610 TURNAROUNDS | Texas | Good | 2017 | 128.0 m | 46,500 |
| LINCOLN AVE | Texas | Good | 2004 | 66.1 m | 46,437 |
| LINCOLN AVE | Texas | Good | 2005 | 66.1 m | 46,437 |
| Piney Point Gulley | Texas | Fair | 1931 | 9.4 m | 46,429 |
| JORDAN GULLY | Texas | Good | 2024 | 30.5 m | 46,415 |
| Channel (NO FEMa ID) | Texas | Good | 2024 | 8.4 m | 46,415 |
Frequently Asked Questions
The National Bridge Inventory (NBI) is a federal database maintained by the Federal Highway Administration containing inspection data for all bridges on public roads in the U.S. with a span of more than 20 feet. Bridge owners must inspect each structure at least every 24 months.
ADT stands for Average Daily Traffic — the average number of vehicles crossing the bridge per day. Bridges are sorted by ADT by default because high-traffic bridges in poor condition pose the greatest risk to the most people.
Yes. Use the search field above to find bridges by name, location, or features crossed. You can also combine the search with state and condition filters to narrow your results.