ENBRIDGE ENERGY, LIMITED PARTNERSHIP
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | ENBRIDGE ENERGY, LIMITED PARTNERSHIP |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 47.04977, -93.11710 |
Cause
| Cause | MATERIAL FAILURE OF PIPE OR WELD |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
ON AUGUST 9, 2021 AT APPROXIMATELY 10:38 AM CDT, AN ENVIRONMENTAL CONTRACTOR PERFORMING WORK ALONG THE RIGHT OF WAY NOTICED A SUSPICIOUS AREA WITH DEAD VEGETATION NEAR LINE 1 AT MP 1032. ENBRIDGE OPERATIONS PERSONNEL WERE NOTIFIED AT 11:26 AM CDT AND DISPATCHED PIPELINE MAINTENANCE PERSONNEL TO INVESTIGATE THE AREA. THE EDMONTON CONTROL CENTER WAS CONTACTED AND ALL LINES IN THE RIGHT OF WAY WERE SHUT DOWN AT 11:47 AM CDT. PIPELINE MAINTENANCE PERSONNEL ARRIVED ONSITE AT 12:00 PM CDT AND CONFIRMED DEAD VEGETATION AND A HYDROCARBON SMELL. THERE WAS NO FREE PRODUCT OR GAS ALARMS PRESENT SO ADDITIONAL RESOURCES WERE DISPATCHED TO BEGIN EXCAVATING THE AREA. AT 6:19 PM CDT, NDE DISCOVERED A PINHOLE ON THE GIRTH WELD AT MP 1032. FURTHER EXCAVATION FOUND APPROXIMATELY 1 BARREL OF CRUDE HAD BEEN RELEASED FROM LINE 1. ALL OTHER LINES IN THE AREA WERE RESTARTED AND CLEANUP BEGAN ON THE RELEASE. A CALL TO THE NRC WAS MADE ON AUGUST 9, 2021 AT 7:10 PM CDT BUT ENBRIDGE PERSONNEL WAS PLACED ON HOLD UNTIL 7:24 PM CDT WHICH IS THE TIMESTAMP SHOWN ON THE NRC REPORT (REPORT #1313243). THE 48-HOUR NRC NOTIFICATION WAS MADE ON AUGUST 11, 2021 AT 1:32 PM CDT (REPORT #1313400). A PLIDCO SLEEVE WAS INSTALLED AND LINE 1 WAS RESTARTED ON AUGUST 11, 2021 AT 11:19 AM CDT. APPROXIMATELY 105 CUBIC YARDS OF CONTAMINATED SOIL WAS REMOVED FROM THE RELEASE SITE. A CUTOUT WAS PERFORMED ON AUGUST 30. THE METALLURGICAL ANALYSIS IDENTIFIED A THROUGHWALL GIRTH WELD MANUFACTURING ANOMALY ASSOCIATED WITH A BURN-THROUGH FROM ORIGINAL CONSTRUCTION AS THE CAUSE OF THE RELEASE. SUPPORTING EVIDENCE FOR THIS CONCLUSION INCLUDES THE MORPHOLOGY OF THE LEAK PATH, THE ABSENCE OF A ROOT BEAD, THE PRESENCE OF WELD SLAG ALONG THE LEAK PATH, AND THE ABSENCE FOR ANY OTHER MECHANISM.
About This Pipeline Incident
Pipeline incident data is reported to the Pipeline and Hazardous Materials Safety Administration (PHMSA). All significant incidents involving fatalities, injuries, or property damage over $50,000 must be reported.