ONEOK NGL PIPELINE, LLC
hazardous_liquid Incident —
Incident Information
| Report Date | — |
| Operator | ONEOK NGL PIPELINE, LLC |
| Commodity | — |
| Pipeline Type | hazardous_liquid |
Location
| State | |
| Coordinates | 36.77514, -97.76171 |
Cause
| Cause | EQUIPMENT FAILURE |
| Subcause | — |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | — |
| Lost Commodity | — |
| Public/Private Damage | — |
| Emergency Response | — |
| Environmental Remediation | — |
| Other Costs | — |
Location Map
Incident Narrative
DECEMBER 19TH AT 15:15 AT THE MEDFORD ARBUCKLE II SITE, A PLANT OPERATOR NOTICED A SMALL ICE BALL ON A 1.5"" BALL VALVE. PLANT OPERATOR CONTACTED PIPELINE OPERATOR WHO ARRIVED AT 16:15 AND VERIFIED A PINHOLE LEAK ON THE BODY OF A BLOWDOWN VALVE. THE LOCATION OF THE VALVE ON THE METER SKID REQUIRED THE PIPELINE TO BE SHUTDOWN TO ISOLATE VALVE. PIPELINE WAS SHUTDOWN AT 18:37 ON 12/19/21. VALVE WAS ISOLATED FROM THE PIPELINE AFTER LINE WAS PURGED. VALVE WILL BE REMOVED AND SENT TO LAB FOR METALLURGICAL TESTING. PIPELINE WAS STARTED BACK UP 12/20/21 AT 13:27. 10/04/22 UPDATE: THE RESULT OF THE METALLURGICAL ANALYSIS INDICATES THAT STRESS RISERS ASSOCIATED WITH THE VOIDS IN THE AS-MANUFACTURED WELD METAL WAS THE CAUSE OF THE 1.5"" BALL VALVE FAILURE. 10/20/22 UPDATE: UPDATED .77 BARRELS RELEASED TO PHSMA CALCULATIONS OF .8.