"ONEOK ROCKIES MIDSTREAM, LLC"
gas_transmission Incident — — November 13, 2025
Incident Information
| Incident Date | November 13, 2025 |
| Operator | "ONEOK ROCKIES MIDSTREAM, LLC" |
| Commodity | NATURAL GAS |
| Pipeline Type | gas_transmission |
Location
| State | |
| Coordinates | 48.29207, -103.56041 |
Cause
| Cause | MATERIAL FAILURE OF PIPE OR WELD |
| Subcause | ORIGINAL MANUFACTURING-RELATED (NOT GIRTH WELD OR OTHER WELDS FORMED IN THE FIELD) |
Casualties
| Fatalities | 0 |
| Injuries | 0 |
Costs
| Property Damage | $4,000 |
| Emergency Response | $0 |
| Other Costs | $1,800 |
Location Map
Incident Narrative
"ON NOVEMBER 13, 2025, ONEOK GAS CONTROL REPORTED A PRESSURE DROP ON THE 16-INCH STEEL TYPE C EAST FORK DISCHARGE PIPELINE. AN OPERATOR RESPONDED TO EAST FORK COMPRESSOR STATION FOR AN EMERGENCY SHUTDOWN (ESD). A SECOND OPERATOR WAS DISPATCHED TO ISOLATE THE PIPELINE AT A NEARBY BLOCK VALVE. THE PIPELINE WAS ISOLATED, AND OPERATIONS CONFIRMED THE RELEASE LOCATION. THE AREA AROUND THE POINT OF RELEASE WAS BARRICADED TO PREVENT ENTRY. WE DEEMED A REPORTABLE EVENT HAD OCCURRED. THE DAMAGED PIPE MATERIAL WAS SENT FOR METALLURGICAL ANALYSIS. THERE WERE REPAIRS MADE TO THE AFFECTED SECTION. THE PIPELINE OPERATING PRESSURE WAS DE-RATED PENDING ANALYSIS RESULTS. A SUPPLEMENTAL WILL BE SUBMITTED WAS ONCE RESULTS FROM THE INVESTIGATION HAVE BEEN RECEIVED AND REVIEWED. SUPPLEMENTAL- THE RESULTS OF THE METALLURGICAL ANALYSES REVEALED THAT THE IN-SERVICE FAILURE WAS ASSOCIATED WITH LATENT MECHANICAL DAMAGE ON THE PIPE BODY. THE FAILURE ORIGINATED WITHIN A GOUGE THAT WAS 1.7 FEET LONG AT AN ORIENTATION OF 7:30. SHEAR CRACKS DEVELOPED IN THE GOUGE WHICH ULTIMATELY CAUSED THE FAILURE. THE SOURCE OF THE GOUGE IS UNKNOWN."